Generator Installation

Posted: Wednesday, August 30th, 2006 at 17:14 by Neil Watson

Given recent power issues we have been sourcing new capacity in relation to our backup generator supply. We are pleased to inform you that we have been advised that a single new 900kVA generator will be in place for Friday morning, when it can then be connected, without interruption, to our supply.We are currently planning for the work to begin at 08.00hrs on Friday morning; the work can be carried out whilst the main power supply is connected, therefore providing us with the opportunity to complete without downtime.

There is however a small risk associated with this method, as during the work we will be without back up generator. The work is envisaged to take less than 30 minutes to complete. Following on from the installation, the generator will be fully tested on Sunday morning, we are currently waiting to confirm the time of the test and will advise as soon as this is available.

In the near future we will be adding further capacity to our back up power and will add details to noc.enta.net as appropriate.

2 Responses to “Generator Installation”

  1. Neil Watson says:

    There has unfortunately been a delay in the work being carried out as described above. We are currently waiting for a confirmed time for the switchover and will advise as soon as possible.

  2. Neil Watson says:

    We have now confirmed that a full load test of the generator will take place this coming Sunday, 03rd Deptember 2006 at 08.00hrs.