At-Risk: Preston POP

Posted: Wednesday, October 25th, 2017 at 10:57 by Ryan Berrisford

Thursday 26th October 04:00 – 06:00

During the above window, our colocation provider is carrying out planned power work within the point of presence. Although the work is expected to be non-service affecting, services at the location should be considered at risk for the duration.

The planned work is expected to take less than 10 minutes.

One Response to “At-Risk: Preston POP”

  1. David Derrick says:

    It appears the power work did cause our equipment to power off. Al; services appear to have recovered.

Leave a Reply

You must be logged in to post a comment.