Posted: Thursday, October 26th, 2017 at 12:21 by Ryan Berrisford

Due to the recent power incidents, BT is performing a full health check within each BT point of presence (POP) where Entanet take services. The health checks should not be service impacting.

Following on from the health check remedial work may be required in some locations. In those instances, planned work and at-risk notifications will be communicated via the comments section of this post. The notification will contain the POP and time-frame it should be considered at risk.

10 Responses to “POP Locations”

  1. Ryan Berrisford says:

    At-Risk Location: Colindale POP

    At-Risk Time Frame: 27/10/2017 00:01 – 06:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The planned work is expected to take less than 10 minutes.

  2. Ryan Berrisford says:

    At-Risk Location: Cardiff POP

    At-Risk Time Frame: Monday 30/10/2017 08:30 – 11:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    As the work is being carried out within a sensitive window, Entanet engineers will be on site overseeing the work.

  3. Ryan Berrisford says:

    Emergency Maintenance

    At-Risk Location: Bristol POP
    At-Risk Time Frame: Friday 27/10/2017 08:30 – 11:00

    Due to an identified issue, during the above window, our colocation provider is carrying out emergency power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The work is expected to take less than 10 minutes.

  4. Ryan Berrisford says:

    At-Risk Location: Glasgow POP

    At-Risk Time Frame: 03/11/2017 09:30 to 12:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The planned work is expected to take less than 20 minutes and Entanet engineers will be present for the duration.

  5. Ryan Berrisford says:

    At-Risk Location: Sheffield POP

    At-Risk Time Frame: 03/11/2017 10:00 – 13:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The planned work is expected to take less than 10 minutes.

  6. Ryan Berrisford says:

    The planned power work at the Sheffield POP has been postponed. A further At-risk window will be posted in due course.

    All other locations notified under this post have had their planned work completed and are no longer considered at risk.

  7. Ryan Berrisford says:

    At-Risk Location: Newcastle POP

    At-Risk Time Frame: 07/11/2017 09:30 – 12:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The planned work is expected to take less than 10 minutes.

  8. Ryan Berrisford says:

    At-Risk Location: Manchester POP

    At-Risk Time Frame: 08/11/2017 09:30 – 12:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The planned work is expected to take less than 10 minutes.

  9. Ryan Berrisford says:

    At-Risk Location: Preston POP

    At-Risk Time Frame: 07/11/2017 09:30 – 12:00

    During the above window, our colocation provider is carrying out planned remedial power work within the point of presence. Although the work is expected to be non-service affecting, directly connected customers should be considered at risk for the duration.

    The planned work is expected to take less than 10 minutes

  10. Ryan Berrisford says:

    At-Risk Location Update: Preston and Newcastle POPs
    At-Risk Time Frame: 07/11/17 12:15 to 17:00

    Due to unforeseen circumstances, the at-risk window at the above locations has changed.

    Although no downtime is expected, directly connected customers should be considered at risk between 12:15 and 17:00.

    Both locations will be at risk for a 10 minute period within the time frame specified.