Archive for June 12th, 2018

Emergency Maintenance: Nottingham

Posted: Tuesday, June 12th, 2018 at 17:55 by David Brewis

Wednesday 13th June 2018 20:00 – 22:00

During the above window we will be investigating a potential issue with the power infrastructure at this site. No downtime is expected however all directly connected services should be considered at risk for the duration of this maintenance window.

  1. Our investigation is now complete, services should no longer be considered at risk.

Emergency Maintenance: Bristol

Posted: Tuesday, June 12th, 2018 at 17:43 by David Brewis

Thursday 14th June 2018 00:01 – 02:00

During the above window we will be investigating a potential issue with the power infrastructure at this site. No downtime is expected however all directly connected services should be considered at risk for the duration of this maintenance window.

  1. Gurinder Bansal says:

    Our investigation is now complete, services should no longer be considered at risk.

Planned Maintenance: DSL Platform

Posted: Tuesday, June 12th, 2018 at 16:39 by David Brewis

Wednesday 20th June 2018 01:00 – 06:00

During the above maintenance window we will be completing configuration changes identified during a previous maintenance. This work will allow for metrics to be placed on the broadband traffic facilitating the direction of traffic to be steered dependent on where best suited.

Once these works are completed, broadband traffic will be steered away from Entanet’s DSL platform in Telehouse to Interxion, with sessions monitored to evaluate the failover. After confirmation sessions have fully migrated, the DSL platform will be steered away from Interxion to Telehouse allowing to test the other direction. Once sessions have fully migrated over, resiliency will be restored across both locations.

No downtime is expected however DSL customers should be considered at risk for the duration of the window.

  1. Ming-Yu Hsieh says:

    This work is now complete.