Archive for August 20th, 2019

Planned Maintenance 20th August.

Posted: Tuesday, August 20th, 2019 at 15:48 by Adam Heath

As part of our ongoing drive to improve the new VoIP platform, we shall be carrying out essential maintenance to our VoIP service this evening, which will necessitate a short period of down-time.

The outage window will occur on Tuesday 20 August from 21:00 to 21:30 hours.

 

Kindest regards

 

 

Emergency Maintenance: interxion3.core

Posted: Tuesday, August 20th, 2019 at 14:22 by Jamie Smith

Tuesday 20th August 2019 14:30 – 18:00
During the above window, we will be carrying out a non-service affecting reload to one of the line cards that part of our DSL platform terminates on, due to recurring alarms on the affected line card. These preventative works are to stop any potential service affecting problems occurring. The work will be carried out in 2 phases.

Phase 1: (Approx 14:30)

Cost DSL traffic away from Interxion DSL platform to Telehouse East DSL platform

Phase 2: (Approx 17:30 – 18:00)

Reload of affected line card

Once the line card has been reloaded and verified that the alarms are no longer present, traffic will be costed back to the Interxion DSL platform

Services should still however be considered at risk during this maintenance due to the loss of resilience whilst these works take place.

We apologise for the short notice of this maintenance notification

  1. Jamie Smith says:

    Phase 1 of this work has now been carried out.

  2. Jamie Smith says:

    Phase 2 – Reload of the affected line card will be commencing now

  3. Jamie Smith says:

    This work has completed successfully. Traffic has now been costed back to Interxion DSL platform.