Posts Tagged ‘Cambridge’

At Risk: Cambridge POP

Posted: Friday, August 19th, 2016 at 16:21 by Richard Partridge

Monday 22nd August – 10:00 to 16:00

During the above window we will be replacing the UPS protecting camb.core. No downtime is expected however the site should be considered “at-risk” for the duration of the window.

  1. Richard Partridge says:

    This work has now been completed.

Planned work: camb.core.enta.net

Posted: Thursday, January 7th, 2010 at 14:09 by Steve Lalonde

Monday 18th Jan 2010, 03:00hrs – 03:30hrs

During the maintenance window above the IOS on the router will be upgraded to resolve some configuration issues. This software upgrade will require a reboot of the router which should take approx 10 minutes to complete, during which all directly connected customers will lose connectivity.

Traffic that would normally be routed through this equipment will route via alternate paths.

  1. Steve Lalonde says:

    This work was completed successfully.