Emergency Maintenance: nottingham.core

Posted: Monday, October 22nd, 2018 at 17:27 by Jamie Smith

Tuesday 23rd October 10:00 – 14:00

During the above window, one of our engineer’s will be carrying out essential preventative maintenance within our racks at this location to facilitate emergency power works being carried out by our supplier on Thursday 25th October. While this work is being carried out we expect no disruption to services, however any services terminating at this location should be considered at risk for the duration of this window.

Thursday 25th October 00:00 – 06:00

During the above window our supplier will be carrying out essential power works to both of our racks in this location. No downtime is expected due to the preventative measures taken above, however all services at this location should be considered at risk for the duration of the window this includes; DSL, Leased lines and Pseudowires terminating at this location.

 

  1. Gurinder Bansal says:

    Tuesday 23rd October’s work is now complete

  2. Jamie Smith says:

    Please be aware that the work scheduled for Thursday 25th, will now take place on Friday 26th between 00:00 – 06:00. These services are still to be considered at risk.

  3. Jamie Smith says:

    Pleased be advised that our supplier is now carrying out the scheduled work

  4. Jamie Smith says:

    This work has now been completed

Emergency Maintenance: Nottingham

Posted: Tuesday, June 12th, 2018 at 17:55 by David Brewis

Wednesday 13th June 2018 20:00 – 22:00

During the above window we will be investigating a potential issue with the power infrastructure at this site. No downtime is expected however all directly connected services should be considered at risk for the duration of this maintenance window.

  1. Our investigation is now complete, services should no longer be considered at risk.

Incident: nottingham.core

Posted: Sunday, June 3rd, 2018 at 11:17 by Mark Yardley

We have experienced an unscheduled reload of our Nottingham core router. All directly attached services will have experienced a brief interruption. Initial investigation suggests this was due to loss of power in the location and engineers are investigating further with our co-location provider. All services are now restored and we apologise for any inconvenience caused.

Incident: Nottingham WBC

Posted: Thursday, November 10th, 2016 at 15:21 by Richard Partridge

Engineers are currently investigating an issue causing a loss of service for DSL connections served by the Nottingham WBC node.

Further updates will be provided as and when they become available.

 

  1. Richard Partridge says:

    Our engineers have corrected the problem and service is now restored.

    We apologise for any inconvenience caused.

  2. Neil Watson says:

    A report is now available for this incident which can be found here. Apologies for the problems that this loss of service will have caused for our customers.

Planned work: nottingham.core.enta.net

Posted: Monday, January 11th, 2010 at 09:19 by Steve Lalonde

Tuesday 19th Jan 2010, 04:00hrs – 04:30hrs

During the maintenance window above the IOS on the router will be upgraded to resolve some configuration issues. This software upgrade will require a reboot of the router which should take approx 10 minutes to complete, during which all directly connected customers will lose connectivity.

Traffic that would normally be routed through this equipment will route via alternate paths.

  1. Steve Lalonde says:

    This work was completed successfully.