Planned Work: Interxion DSL core

Posted: Tuesday, March 19th, 2024 at 17:06 by Jamie Smith

Wednesday 03/04/2024 23:59 to Friday 05/04/2024 01:00

During the above window we will be performing works on our DSL core within this location. This is a “dry run” in preparation of the maintenance our Colocation provider will be carrying out https://noc.enta.net/2024/03/planned-work-interxion-datacenter-lon1-crac-unit-replacement/

For the duration of the works the DSL core at this location will be taken down, due to this there will be a loss of resiliency across the DSL estate as all DSL traffic and sessions will be handled via our Telehouse DSL core. Sessions will be drained gracefully from the Interxion LNS pool prior to the works with any remaining sessions forcibly disconnected on the night of the start date before reconnecting to the Telehouse LNS pool.