Posted: January 27th, 2021 at 12:39 by Adam Heath
Thursday 4th February 2021, 21:00 – Friday 5th
February 2021 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above site requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: January 20th, 2021 at 10:28 by Adam Heath
Thursday 28th January 2021, 21:00 – Friday 29th January 2021 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above site requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: January 20th, 2021 at 10:25 by Adam Heath
Thursday 21th January 2021, 21:00 – Friday 22th January 2021 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above site requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: January 14th, 2021 at 13:41 by david labouchardiere
We are currently aware of an issue affecting CityFibre provided leased lines in the Bristol area. Engineers are on site investigating and working to restore service as soon as possible
Posted in Uncategorized | 1 Comment »
Posted: January 6th, 2021 at 11:45 by Iain Beveridge
Thursday 14th January 2021, 20:30 – Friday 14th January 2021 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service it should still be considered at risk.
Posted in At-Risk, Planned Work | 1 Comment »
Posted: December 17th, 2020 at 13:19 by Jamie Smith
Thursday 17th December 2020, 13:30 – 14:00
During the above window we will be carrying out emergency maintenance to the traffic shapers within the DSL platform. This is necessary work due to the ongoing issues documented at https://noc.enta.net/2020/12/incident-dsl-packet-loss/
No downtime is expected to services however broadband services should be considered at risk for the duration of this work. Further work will need to be completed out of hours after this initial maintenance and will be communicated in due course.
Apologies for the short notice and any inconvenience this may cause.
Tags: Emergency
Posted in Uncategorized | 3 Comments »
Posted: December 16th, 2020 at 11:29 by Iain Beveridge
Thursday 7th January 2021, 20:30 – Friday 8th January 2021 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, Kingston TE requires both the ATS and UPS to be refreshed. Although only Kingston is directly effected due to network design customers with services on Colindale core should also be considered at risk.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | 2 Comments »
Posted: December 10th, 2020 at 15:24 by david labouchardiere
We are currently investigating reports of packet loss affecting broadband customers.
Further updates will follow as and when they become available and we apologise for any inconvenience caused.
Posted in Uncategorized | 21 Comments »
Posted: December 7th, 2020 at 12:53 by Adam Heath
Thursday 8th December 2020, 10:00 – 17:30
Due to on going improvements to the power infrastructure within the BT POP’s, we are preforming exploratory work before refreshing the ATS and UPS for this site.
BT will be undertaking maintenance work within the above window which will require the tracing of some cables on site. This will involve the removal of a panel on a DC inverter to visually inspect the connectivity within.
We will not be attempting anything other than a lid removal and visual inspection and the risk to impact during this window is considered low.
Posted in At-Risk, Planned Work | No Comments »
Posted: November 28th, 2020 at 16:17 by Adam Heath
We are currently aware of an incident affecting leased line connections in the Portsmouth area. This is being looked into by our NOC team and engineers are on site to try and resolve this as soon as possible.
Further updates will follow as and when they become available and we apologise for any inconvenience caused.
Posted in Uncategorized | 3 Comments »
We have had a confirmation service should now be restored. Please ask any affected customers to power cycle their hardware on-site if they continue to experience issues.
We apologise for any inconvenience caused by this incident.