Posted: November 26th, 2020 at 07:12 by Jonathan Clarke
We are currently aware of an incident affecting Virgin Media leased line circuits. We are engaging with the supplier to investigate this issue and further updates will be provided in the next hour.
Posted in Uncategorized | 4 Comments »
Posted: November 24th, 2020 at 16:52 by Iain Beveridge
Thursday 10th December 2020, 21:00 – Friday 11th December 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: November 24th, 2020 at 13:09 by Adam Heath
We have just observed a temporary loss of service on our Interxion.edge device which has interrupted internet breakout for some PWAN customers.
Services are now restored and engineers are investigating the root cause. We apologise for any inconvenience this has caused.
Posted in Incidents | 2 Comments »
Posted: November 24th, 2020 at 13:01 by Iain Beveridge
Thursday 3rd December 2020, 21:00 – Friday 4th December 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: November 11th, 2020 at 12:21 by Iain Beveridge
Thursday 26th November 2020, 21:00 – Friday 27th November 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: November 11th, 2020 at 12:15 by Iain Beveridge
Thursday 19th November 2020, 21:00 – Friday 20th November 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, The above TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: November 11th, 2020 at 11:52 by david labouchardiere
We are currently aware of an incident affecting Vodafone leased line circuits. We are engaging with the supplier to investigate this issue and further updates will be provided in the next hour.
Posted in Uncategorized | 17 Comments »
Posted: November 6th, 2020 at 10:55 by jbiddulph
We are aware of a wide-spread packet loss issue following an outage instance that occurred last night. This is being thoroughly investigated for a resolution for as soon as possible.
Further updates will follow as and when they become available and we apologise for any inconvenience caused.
Posted in Uncategorized | 5 Comments »
Posted: November 5th, 2020 at 23:35 by Ryan Berrisford
We are currently aware of an issue affecting DSL connectivity. Initial indications suggest services have synchronisation but no PPP authentication. Technical escalation points have been engaged and an investigation is underway.
Further updates will follow as and when they become available and we apologise for any inconvenience caused.
Posted in Uncategorized | 2 Comments »
Posted: November 4th, 2020 at 16:29 by Iain Beveridge
Friday 6th of November 20:00 – Monday 9th November 06:00
During the above window as small number of circuits provided to us by Virgin Media are at risk while Virgin conduct work to resplice a section of fibre due to a location closure. No circuit will be down for the entirety of the window and any that are effected are estimated to only be down for 30 minutes to a maximum of 4 hours.
Posted in At-Risk, Emergency Work | No Comments »
The supplier is currently investigating the issue. They advised that there appears to be an issue at Telehouse exchange. We are now awaiting a further update.
As soon as we have anything further, we will update you again.
In relation to the loss of service you are currently experiencing. Our supplier is still working hard to resolve these issues as a priority.
They have engineers on site continuing investigations into the loss and intermittent connections that are being experienced.
We will update you again in one hour
In relation to the loss of service you are currently experiencing: our supplier is still working hard to resolve these issues as a priority. Their engineers are on site continuing their investigations in to the intermittent loss of service and packet loss that you may be experiencing. We have chased for further details but unfortunately at present there is no further update.
We will update you again in one hour. Thank you for your continued patience.
Report received from our supplier that they have reconnected a patch in their head end and are seeing our service come back online.
If you are still being impacted please contact us as soon as possible and confirm site checks.