Planned Work: Wolverhampton POP

Posted: Wednesday, August 19th, 2020 at 15:47 by Iain Beveridge

Thursday 10th September 2020, 21:00 – Friday 11th September 2020 05:00

Due to on going improvements to the power infrastructure within the BT POP’s, Wolverhampton TE requires both the ATS and UPS to be refreshed.

Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment will experience a small period of downtime.

Leave a Reply

You must be logged in to post a comment.