Emergency Work: London Interxion Suite (LON44)?
Posted: Wednesday, February 10th, 2021 at 09:47 by Iain BeveridgeWednesday 10th February 2021, 22:00 – Thursday 11th February 2021 05:00
During the above window, we will be working to restore power stability to some customer firewalls within our interxion suite. An ATS that is supplying one of out racks is faulty, we will be moving devices and config one at a time to new infrastructure within another rack in the suite. There will be a small window of downtime as we move these devices one at a time in a staged and controlled manner. This is follows on from last nights work, this window should conclude the work in this rack.
This work has now been completed.
Apologies for any inconvenience this may have caused.