Posted: November 3rd, 2020 at 10:24 by david labouchardiere
We are currently aware of an incident affecting Vodafone leased lines. We are engaging with the supplier to investigate and further updates will be provided ASAP
Posted in Uncategorized | 6 Comments »
Posted: October 30th, 2020 at 22:36 by Adam Heath
Change Summary: Wholesale Ethernet Planned Works Full Outage multiple Sky Circuits.
Type of Change: Planned
Impact: Full outage to service
Start Date: 30/10/2020 00:00:00 GMT
End Date: 31/10/2020 06:00:00 GMT
Start Date: 31/10/2020 00:00:00 GMT
End Date: 01/11/2020 06:00:00 GMT
Start Date: 01/11/2020 00:00:00 GMT
End Date: 02/11/2020 06:00:00 GMT
Reason for work: Maintenance-Third party work
Apologies for any disruption this may cause.
Posted in Planned Work | No Comments »
Posted: October 30th, 2020 at 01:42 by jbiddulph
Good Morning.
We have had a large number of SKY circuits go offline for a period of 30 minutes early this morning. This has been due to unplanned works performed by SKY, but as of 00:55AM. All services should be restored.
We apologise in advance for the inconvenience caused. Given this happened yesterday and again this morning, we are taking further measures to ensure with the supplier there are no further unexpected works.
If you are experiencing any further issues since this morning’s works, please re-boot your service and proceed to call into the support desk if the issue remains.
Posted in Uncategorized | 1 Comment »
Posted: October 29th, 2020 at 02:45 by jbiddulph
Good Morning.
We are currently seeing a large number of SKY leased line circuits offline. At this moment in time, this is under investigation and we are currently in correspondence with suppliers for diagnostics.
Further updates will be provided when available.
Posted in Uncategorized | 3 Comments »
Posted: October 27th, 2020 at 15:44 by Iain Beveridge
Thursday 12th November 2020, 21:00 – Friday 13th November 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, Bristol TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment may experience a small period of downtime.
Posted in At-Risk, Planned Work | No Comments »
Posted: October 27th, 2020 at 15:43 by Iain Beveridge
Thursday 05th November 2020, 21:00 – Friday 06th November 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, Stepney TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment will experience a small period of downtime.
Posted in At-Risk, Planned Work | 2 Comments »
Posted: October 15th, 2020 at 18:05 by Jonathan Clarke
We are currently seeing a number of Virgin Media leased line circuits as down. These circuits appear to be in the Birmingham area at present. We are currently in correspondence with suppliers for diagnostics.
Further updates will be provided when available.
Posted in Uncategorized | 4 Comments »
Posted: October 14th, 2020 at 13:09 by david labouchardiere
We are currently aware of an issue affecting CityFibre provided pseudowire circuits through Telehouse North. Engineers are investigating and further updates will be provided as soon as possible.
Tags: Incidents
Posted in Incidents | 1 Comment »
Posted: October 6th, 2020 at 14:33 by Iain Beveridge
Thursday 29th October 2020, 21:00 – Friday 30th October 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, Slough TE requires both the ATS and UPS to be refreshed. Although only Slough is directly effected due to network design customers with services on Kingston & Colindale core’s should also be considered at risk.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment will experience a small period of downtime.
Posted in Uncategorized | No Comments »
Posted: October 6th, 2020 at 14:29 by Iain Beveridge
Thursday 22nd October 2020, 21:00 – Friday 23rd October 2020 05:00
Due to on going improvements to the power infrastructure within the BT POP’s, Preston TE requires both the ATS and UPS to be refreshed.
Therefore, BT will be undertaking maintenance work within the above window which will require the power feeds to be moved, whilst an ATS & UPS are swapped within the rack. Although the core network router is not expected to experience any loss of service, customers connecting into the adjacent equipment will experience a small period of downtime.
Posted in At-Risk, Planned Work | 2 Comments »
The supplier is currently investigating the issue but confirm they are seeing their hardware at the affected hub as down. We will provide a further update in the next hour.
The supplier is still investigating this issue, they are now in the process of raising a field engineer to troubleshoot the affected hardware. We will provide a further update in the next hour
Engineer resources are en route to the affected POP with an ETA of 14:00
Engineer is now on site and investigations have begun
Supplier engineer is continuing to work on the issue with replacement parts expected to arrive on site at 15:30
We are seeing services coming back up following a reload of the affected hardware on site. Please ask any affected customers to power cycle their hardware on site if they continue to experience issues.